Sky Tower
CFD simulations of smoke control systems in the underground car park and the shopping mall in a mixed-use development
CFD simulations of smoke control systems in the underground car park and the shopping mall in a mixed-use development
Concept design and CFD simulations of smoke ventilation system in the extended part of the shopping mall
Detailed CFD analysis including verification of the smoke removal system of the underground train station and a railway tunnel. Performing evacuation time analysis. Structura fire anaysis of the tunnel structure and steel structure of the skylights in the station.
Concept design of smoke ventilation system, fire protection strategy and formal approval of building permit design for an extension to existing pet food factory.
Concept design of a natural smoke ventilation system, fire protection strategy, formal approvals and construction stage advice for an automotive production facility
Concept design of natural smoke ventilation and formal approval with respect to fire protection requireemtns for an extension to exisitng warehouse building
Concept design and CFD simulations of a jet fan smoke ventilation system in underground car park, fire protection strategy and formal design approval for a residential scheme
Concept design and CFD simulations of a jet fan smoke ventilation system in the enclosed car park, fire protection strategy, formal approval
Concept design and verification of a natural smoke control system based on recommendations of BS 7346-4 for a commercial one storey building
Lokalizacje: Wrocław, PL Zleceniodawca: Inwestor: Kaufland Architekt/Projektant: TH Architekci Wykonawca: Wartość inwestycji:
CFD analysis of smoke ventilation system in a two-storey concourse atrium of a railway station. Hot smoke tests of the system after completion of construction works.
Smoke and heat exhaust ventilation system (SHEVS) design for an industrial building
Concept design of a smoke control system of a shopping mall with verification calculations. The scope of the analysis included the natural smoke removal system in a shopping mall as well as in the anchor store.
Concept design for several buildings in the area of “Innova” district, CFD simulations of a ducted and jet fan smoke ventilation system in underground car parks, hot smoke tests for two phases (buildings B3 and B5).
Concept design based on BS 7346 and detailed CFD simulations of smoke ventilation system for an extension to an exisiting shopping centre
Concept design in accordance with NFPA 204 of a natural smoke and heat exhaust ventilation system (SHEVS) for two warehouse buildings
Concept design of a smoke exhaust ventilation system in a shopping mall (as an external consultant for Ahearne Fire Engineering Consultants)